It mainly includes three parts: the main thruster, the power station, and the operating room. The main thruster push-pull device and the detachable design of the clamp head are convenient for transportation and installation.
The edge of the large pipe clamp adopts its own patented technology: serrated edge technology, which fundamentally eliminates the damage caused by the extrusion and deformation of the tile gap during the construction process.
Choosing different lining materials for different pipes effectively increases the friction on the pipeline while minimizing damage to the pipeline anti-corrosion layer during the pushing process.